2014event_site_headerSR.jpg

Siemens-PLM-Connection-2014-Americas-Conference-Graphic-X5.jpg

Premium & Deluxe Partners

 

2014 PLM World Partner

 

 

 

 

User Requested Topics | Call For Topic

For the first time ever, PLM World has asked YOU the users, what sessions you would like to see at this year's annual user conference. As a presenter submitting a session, please review what other users have requested and submit your abstract based on what users want to see! Please visit the presenter's page for more information on submitting an abstract.
  • Call for Abstracts will open November 1st, 2013.
  • Call for Abstracts will close January 17th, 2014.

Remember that you are not limited to only these topics. If your topic does not fit to one below, we still encourage you to submit other topics as well. 


Intended Audience

 This year PLM World has defined 3 primary audiences to help tailor your presentation: 

   User Experience, Business Process Improvements, Deployment Excellence 

   Consider where your expertise shines and streamline your session to the
   perfect audience. You will be asked to select one when submitting your abstract.



Abstract Submission is now Closed

 

If you plan to submit an abstract in response to a User Requested Topic below, please enter on the abstract submission form, the section & number of the topic from the list below.

Teamcenter Basics / Foundation
A Bill of Materials / Reconciliation
A-1 How to integrate CAD Structure - EBOM Structure - MBOM Structure and BOP into a set of aligned structure in case of CAD and EBOM/Part separation and alignment.
A-2 Tablet use in the Enterprise / Mobility
B Change Management
B-1 Using Teamcenter Change Management in a multisite environment where the data and change participants are spread across in different sites. How to overcome global workflow challenge
B-2 Visualization
B-3 Consumer Use of Visualization
B-4 Supplier use cases, best practices and options
C Data Management
C-1 Data management in Teamcenter. Establishing a well-defined data structure, and policies for easy to find information and well-structured product information.
Teamcenter Extension (Expansion)
D Systems Engineering
E Program and Project Management
E-1 Large program schedules
E-2 Integration between program offices - vertical and organizations horizontal (engineering, manufacturing, quality, etc.)
E-3 Schedule Manager Demo's showing integration into change management, requirements manager, etc...

E-4

Schedule Manager- what are the long term plans for enhancing the functionality and build more standard tools and reports into that domain
F System Interoperability
F-1 End to End demonstration
F-2 Synergistic integrations within TcUA (BOM reconciliations between modules, requirement traceability across domains, consistent notes across all modules, consistent markups across all modules)
F-3 Defining custom contexts with Graphical Relations Browser to navigate the object relationships. (Note: today just get all relationships or filtered to Traceability relationships)
G MBE – Model Based Enterprise
H Verification management
H-1 Mutli-Discipline Simulation in Support of Closed Loop System Verification and Performance Balancing
I Teamcenter - Other
I-1 Social Collaboration
I-2
IRDS - Information Retention and Disposal - using Teamcenter
I-3 Simplification of Processes - how TC and/or related tools can help
I-4
Integrated solutions to business issues and challenges across Teamcenter modules, NX, NXCAE and Tecnomatix.
J Supplier/External Integration
J-1 Design Collaboration with Supplier
J-2

All solutions supported by Teamcenter 10 for External Collaboration (eg.bw OEM and Suppliers) :

  • TC SRM
  • Briefcase
  • TC Community
  • STEP formats including CAD issues
K Materials Management
K-1 Integrated management (not just one or two objects, but a process based flow used in an integrated fashion across the PLM value chain)
L Teamcenter Compliance
L-1 Case studies on Compliance management
L-2 Implementation of ROHS, ReACH, WEE with Teamcenter
M Reporting
M-1 How to get information to the consumer to help the business
M-2 Highlight how changes in 10.1 workflow audit histories will improve desired workflow dashboards
M-3 Provide samples
Teamcenter for the IT Professional
N Migration to UA
N-1 Data migration techniques
N-2 Enterprise gap closure (including A&D functionality)
O Active Workspace
O-1 Deployment strategies
P Teamcenter Extensibility
P-1 BMIDE
P-2 Workflow
P-3 A top down, strategic process for the construction of workflows, including use of lower-level and sub processes, management of targets, use of participants and selection and characteristics of handlers.
Q Tc Global Deployment
R TcUA Performance
R-1 Performance & Tuning, tips, tricks, etc
S Visualization
S-1 Auto creation of files (JT and others)
T Teamcenter Security
T-1 Support of new regulations
U Subscription Manager
U-1 Subscription Manager: How to setup subscription manager from installing the template to setting preferences to setting a notification for end users 
Management
V Personal Growth Opportunities
V-1 Best practices for managing PLM Projects  
V-2 Managing organizational and cultural change as part of a PLM program to improve adoption and sustainment.
V-3 Are the academic communities (University, Colleges, and K-12 schools) providing the education and training necessary to meet the needs of PLM-enabled companies? What skills are missing? How is your company working with the schools? Can you find the talent you need now, what are your expectations for the future?  
V-4 Effectively operating a global and dispersed engineering organization, extending into your supplier ecosystem, by leveraging PLM  
V-5 Non-PLM productivity tools (iPad apps)  
V-6 Ways to get better value from training and education  
V-7
Productivity gains from using a 3D Mouse  
V-8 What defines a "NX Proficient" Designer or Engineer?
In an ever increasing contractual workforce that spans the globe, how can an employer really find competent, professional Designers and/or Engineers that truly understand basic NX functionality like Modeling, Assemblies, and Drafting? This question has become more important with the advent of the outsourcing of talent acquisition with most employers. Can an employer afford to take a risk on unproven talent, especially with tighter deadlines and margins?
 
W Industry Verticals
W-1 Address any specific topic related to industry best practices
W-2 Design and Manufacturing Solutions for Composite Aerostructures
W-3 Shipbuilding 4GD and NSRP Weld Management round table. One each or combine them, whatever makes the most since.• 4GD, Not sure what level this would be since everyone is trying to figure out how to best implement this. In addition this is both a Design and Database session. Could add some multi cad “migrations” to this one. Probably muddy the water though. • Shipbuilding/Heavy Structures• Shipbuilding Routing• Penetration Management (PMI)• 4D Planning
NX Design
X Drafting
X-1 How to manage multi-configuration, NX assembly drawings correctly using auto-ballooning and auto-parts lists
Y Large Assembly – 4GD
Y-1 Techniques for managing large assemblies
Y-2 Working with large assemblies, and efficiently querying assembly constraints.
Z Mechanical Routing
Z-1 Best practices for Mechanical Routing of hydraulic hoses and tubing (including deformable routings at higher levels assemblies).
AA ECAD connectors
AA-1 Connecting ECAD with MCAD
BB Design Capabilities
BB-2 Collaborative Design Approaches
BB-3 Best practices on installing/upgrading and patching in a Global Enterprise environment. An environment where there are multiple users, multiple hardware instances, and limited IT staff (users don’t have admin rights
BB-4 Advanced Automation using NX Open
BB-5 Best method to perform feature group patterning of complex shapes
BB-6 Building a reusable knowledge database in NX
BB-7 Integrating mechanical design and electrical/electronic systems
BB-8 Topics that demonstrate the simultaneous engineering with NX and Teamcenter and product automation capabilities with Siemens NX Open
BB-9 Linking custom created attributes to and from NX and Teamcenter
CC Product Template Studio
CC-1 Construction of an assembly using PTS as the interface for building variations on the model.
DD JT
DD-1 Managing Multi-CAD with JT or other neutral cad files. Technical review of how its done- using Pro/E JT in an NX assembly or vise- versa. How to make this a seamless process across all major CAD systems.
EE Synchronous Technology
EE-1 Best practices for working with data from foreign CAD systems
EE-2 Practical applications of Synchronous Technology
FF Mold Design
FF-1 Mold wizard and Progressive die wizard
GG Rendering
GG-1 Best practices for capturing and creating a high quality JPEG image.
NX Manufacturing
HH CAM
HH-1 Turning and Mill/Turn
HH-2 Five axis machining and programming
HH-3 CNC on machine probing.
HH-4 Simplification of feature recognition and customizing of paths for recognized features
HH-5 Incorporating into NX CAM programming elements of subprograms which greatly reduces the length of program and control of single units instead of multiple instances. 90% of aerospace industry is using it. It allows to work on bigger parts then machine limits. Example: Drill hole on X-25. Y.0 Then : Rotate, Drill, Rotate, Drill, Rotate, Drill, Rotate, Drill, Rotate, Drill, Rotate, Drill, etc.
HH-6 Feature Based Machining
HH-7 NC CAM Integrated Simulation and Verification
NX Simulation
II Simulation
II-1 ESATAN/ESARAD conversion flow and best practices (both from and to NX).
II-2 Automotive Composites CAE Simulation for Fatigue and Crash
II-3 Mutli-Discipline Simulation in Support of Closed Loop System Verification and Performance Balancing
User Experience
II-4 Aircraft fuselage analysis (Composites, Thermal, Loads, Stress) 
II-5 Applications of motion and motion with controls and/or flexible bodies 
II-6 Applications of Synchronous Technology to prepare CAE models 
II-7 Assembly FEM to efficiently model large structures 
II-8 Automotive Composites CAE Simulation for Fatigue and Crash 
II-9 Linking NX CAE to DOE/Optimization 
II-10 Model-based multi-discipline development using 1-D and 3-D methods 
II-11 Multi-Discipline Simulation in Support of Closed Loop System Verification and Performance Balancing 
Business Process Improvements 
II-12 Automating CAE workflows for Designer use and enhance CAE workflows 
II-13 CAE in a Managed Mode (Simulation data and process management) 
II-14 ESATAN/ESARAD conversion flow and best practices (both from and to NX) 
II-15 Model-Based System Engineering and Moving Analysis Earlier in the Design Process  
Deployment Excellence 
II-16 Tiered Storage Management Inclusive of HPC Environments 
Tecnomatix
JJ 3D Printing / Additive Manufacturing
KK Digital Manufacturing
KK-1 Human Factors in Teamcenter (x2)
KK-2 Shop floor integration - How can OUT OF THE BOX Teamcenter and NX be used on the shop floor without having to hire a 3rd party company? Is it possible? Does Teamcenter have the tools necessary to help the average company increase productivity and help the bottom line without having to add on yet another piece of software?
Cross Product
LL Meeting the engineering challenges of lightweight fuel efficient vehicles
MM PMI
MM-1 Industry Success
MM-2 Extension into Teamcenter Unified data model
MM-3 Consumer usage
MM-4 Seamless flow into Teamcenter Visualization and/or JT for downstream usage
MM-5 Display for Teamcenter Mobility on iOS